Hundreds of kilometers of quality roads, hundreds of thousands of square meters of top residential and commercial space, numerous specialized facilities across the country made to the highest world standards – place GEMAX at the very top of construction in the region.
Projects
Airport City
Doncafe Factory
Porshe Belgrade
Metro
Coridor 10
Highway E-763
In the section Surčin-Obrenovac, Highway E-763, in 2019, 95,670 t of asphalt were installed for the needs of construction of the road structure, bridge and loops. Approximately 35 km of curbs were also delivered.
LIDL
Over 6,000 tons of asphalt were delivered for the needs of ground floor arrangement and parking of LIDL sales centers in Novi Sad and Indjija.
Belgrade on water
Approximately 3,000 tons of asphalt and 2,000 m3 of sand were delivered for the needs of the ground floor arrangement of Central Park.
NCR
For the needs of drainage of the facility in New Belgrade, close to 6,000 m3 of natural gravel and fraction 32+ were delivered, as well as approximately 30,000 m3 of concrete.
ZF Mobility - Pančevo
Approximately 9,000 tons of asphalt were delivered for the needs of the ground floor.