PROJECT DETAIL

LOCATION
Simanovci, Serbia

INVESTOR
JUB Ljubljana, Slovenia

DESCRIPTION OF WORKS
Complete construction on "turnkey" basis

SURFACE
Production hall on surface area of 3.800 m2: administrative building on 1.250 m2, auxiliary facilities on 700 m2, and field arrangement on 6.000 m2

VALUE OF WORKS
2.8 million €

WORKS END
2004.

Near the toll gate on highway E75 in Simanovci, Gemax built a coating factory and business center. Production hall is located on the surface area of 5.750 m², as well as administrative part and auxiliary facilities. Next to the building, complete infrastructure was built (water supply, rain and sewerage system, public lighting, etc.) together with parking lots on surface area of  6.000 m² and access roads.