Streets in economic area “Gornji Zemun”

As a part of infrastructure "Gornji Zemun", Gemax has successfully executed works on construction of eight roads.

Knauf ulice
Streets towards Knauf
Streets towards Knauf
PROJECT DETAIL

LOCATION
Zemun, Serbia

INVESTOR
Belgrade Land Development Public Agency

DESCRIPTION OF WORKS
Road construction in economic area

LENGTH
5.024 m

VALUE OF WORKS
6.3 million €

END
2009.
  • service 1, length 553 m, width of pavement 7 m
    - from March till December 2007.
  • service 2, length 500 m, width of pavement 7 m
    - from July 2006 till February 2007.
  • service 6, length 828 m, width of pavement 7 m
    - from March till December 2007.
  • S1, length 848 m, width of pavement 7 m
    - from April till December 2009.
  • S3, length 837 m, width of pavement 7 m
    - from July 2006 till February 2007.
  • S-4, length 567 m, width of pavement 7 m
    - from July 2006 till February 2007.
  • S-24, length 618 m, width of pavement 12 m
    - from June till September 2008.        
  • S-26, length 273 m, width of pavement 7 m
    - from June till September 2008.

Sidewalks,complete infrastructure of water supply, rain and sewerage system and public lightening were constructed on all above listed roads, along with displacement of existing installation.