Project "Mali zbeg"

Gemax built foul sewerage system in residential area "Mali zbeg" in Borca in 2009.

Mali Zbeg
Project Mali zbeg
Project Mali zbeg
PROJECT DETAIL

LOCATION
Borca, Serbia

INVESTOR
Belgrade Land Development Public Agency

DESCRIPTION OF WORKS
Construction works on fecal sewerage 

LENGTH
460 m Ø400 and 2.570 m Ø250

VALUE OF WORKS
1.7 million €

END
2009.

Solving the problem of foul sewerage system in residential area "Mali zbeg" in Borca lasted several years. The project was finally implemented during 2009. in main streets: 460 m Ø400 and 2.570 m Ø250 with 1.345,00 m household utilities. Works were executed in unfavorable conditions - high level of ground water and very poor ground features. With this sewerage construction and by connection to the existing one through pumping station, we resolved the problem of secondary network as well as the wastewater problem that existed in the whole residential area.

Apart from these works Gemax was in charge of additional works on reclaimed canal crossover.